Skip to contentSkip to main menu
한국어
Text size 100%

Fees

Soil Survey (Field Survey) & Sampling

Fees for soil survey (field survey) and sampling — provided in the order of category, details, and fee
CategoryDetailsFee
Soil survey & diagnosis13 site-environment items + 11 soil-profile survey itemsKRW 500,000 per site
SurchargeTravel expenses (based on 50 km one-way) and overheads separate; VAT excluded—
Surcharge NoticeAll prices exclude value-added tax (VAT). For field surveys, travel expenses (based on 50 km one-way) and overheads are added separately.

Fees by Analysis Item

Fees by analysis item — provided in the order of category, item, and unit price per sample (KRW, VAT excluded)
CategoryItemUnit price (KRW)
PhysicalSample drying & preparation (10 or more samples)5,000
PhysicalSample drying & preparation (fewer than 10 samples)10,000
PhysicalParticle-size analysis14,100
PhysicalGravel content10,000
PhysicalSoil three-phase (bulk density)11,600
PhysicalCoarse porosity (volumetric water content)38,800
PhysicalSaturated hydraulic conductivity16,800
Physical100cc sample can rental14,100
ChemicalpH10,500
ChemicalOrganic matter23,100
ChemicalTotal nitrogen23,100
ChemicalAvailable phosphate10,500
ChemicalCation exchange capacity (CEC)31,500
ChemicalExchangeable K·Na·Ca·Mg10,500 each
ChemicalElectrical conductivity (EC)10,500
ChemicalHeavy metals12,600 per item

※ Prices are per sample and value-added tax (VAT) is excluded.

Turnaround Time (Business Days)

Current intake status — Normal

Samples are being processed within the standard turnaround time.

As of 2026-11-28

Analysis turnaround time — provided in the order of number of samples and turnaround time (business days)
Number of samplesTurnaround time (business days)
1–10 samples7 business days
11–20 samples10 business days
21–30 samples12 business days
31 samples or more13 business days, plus 1 business day for every additional 5 samples

Counted in business days (excluding weekends and public holidays) from the day your samples arrive at the laboratory. More analysis items add the business days shown below, and turnaround may change with the laboratory workload. If your schedule is tight, please call the laboratory before applying.

※ 표를 좌우로 밀어서 모든 항목을 볼 수 있습니다.

Extra turnaround by number of analysis items — provided in the order of analysis items per sample and additional business days for each sample-count bracket
Analysis items per sample1–10 samples11–20 samples21–30 samples
10 items or fewerNo extra timeNo extra timeNo extra time
11–15 items+1 business day+2 business days+3 business days
16–20 items+2 business days+4 business days+6 business days
21–25 items+3 business days+6 business days+9 business days

※ Turnaround = the turnaround in the table above + the extra business days in this table. Count the analysis items per sample; exchangeable K·Na·Ca·Mg and heavy metals count as one item per element, and sample drying & preparation is not counted. Each cell shows the largest case in its bracket (10 / 20 / 30 samples; 15 / 20 / 25 items); the actual add-on is (number of samples × items above 10) ÷ 50, rounded up, in business days. The same formula applies to 31 or more samples or 26 or more items. Example: 20 samples with 15 items → 10 + 2 = 12 business days.

참고You can estimate the cost as the per-item unit price × the number of samples. For a detailed quote — for example, 6 basic chemical-property items × 10 samples — please consult the laboratory by phone.

Request a soil analysis today

Please call the laboratory before sending your request form, and we will guide you on the analysis items and sample preparation.

Soil Analysis Fees | 한국산지환경연구회